Project conducted in

Egypt

Flood Protection for Master plan

  • Ain Al Sukhna Ring Road
  • Al Qussair Marsa Alam Road
  • Al Wahat Road
  • AlGalalah Mountain Road, 100km, Al Sokhna.
  • Bani Swaif – Zafarana Highway, 160 km.
  • Barnees – Shalateen Road.
  • Middle Ring Road.
  • Moghra Gas Line
  • Mohamed Naguib Road
  • Moshir Axis Extension
  • New Qussair Link (Ragheb)

Wet Utilities

  • El Sokhna and El Tibeen Power plants drainage systems
  • Shalateen & Abo Ramad Fishing Ports
  • Concept design for the hydraulic system proposed for the circulation of a 100,000 m3 inland lagoon, Abo Dabab, Marsa Alam
  • Contributed in the design of El-Rehab construction drawings for water and wastewater network

Hydraulic / Hydro-Dynamic Modeling

  • Concept design for the hydraulic system proposed for the circulation of a 100,000 m3 inland lagoon, Abo Dabab, Marsa Alam
  • Bahr EL Baqar Main Diversion Drain
  • Design of 12000 m2 artificial lagoon of “Hasienda Resort”, Northern Coast

Dam Engineering

  • 3 Dams for flood protection, Private road and a phosphate factory against flash floods, Upper Egypt.
  • Ain Al Sukhna Flood Protection Dams
  • Detention Dam for 15th of May City extension
  • Detention Dam for Sohag Airport
  • 2 Dams for flood protection, Oriental Resort Marsa Alam

Marine Works & Coastal Engineering

  • Design of concrete blocks quay, modeling studies, Tender document preparation, El-max port Alexandria
  • Design of protection works for the bathing area of Mina village, Northern Coast of Egypt. The study includes field investigations, environmental studies and planning
  • Design of 22000 m2 artificial lagoons of “El-Ein Bay Resort”, Ain Sukhna

Ground Water Engineering

  • Subsurface Drainage System for 11th District, Sheikh Zayed City, 6th October City
  • Groundwater Flow Modeling Al-Obour City